Back

Lone Oak Area Waterline Replacement, Phases I & II

Paducah, KY

The Lone Oak region of Paducah Water’s system has experienced numerous main breaks due primarily to system age. The combined Phase I and II projects involved replacement of existing 4-inch and 6-inch AC water mains with approximately 9,000 l.f. of 6-inch restrained joint C900 PVC, 6-inch HDPE and 12-inch DIP water mains along various City streets within the City of Lone Oak.

After conducting detailed topographic and on site engineering surveys, in coordination with utility location efforts, F&H and PW agreed on horizontal directional drilling for a large portion of the project due to the high density residential atmosphere as well as the congested network of telephone, cable, sanitary sewer, and natural gas mains along the alignment.

Location Map