Back

Palmetto Parkway

Aiken County, SC

The Palmetto Parkway Phase II Design Build project is the final leg of I-520 around Augusta and North Augusta. Phase II of the Palmetto Parkway extended the existing Phase I from US 1 for approximately 5.5 miles on new location as a four-lane divided interstate tying into I-20 with a fully directional interchange.

In addition to the mainline roadway, the project consisted of a 10ft wide multi-use path along the entire project, 5 interchanges, 12 bridge sites, and over 18 miles of side road and ramps.

Florence & Hutcheson provided:

  • Preliminary Plan Development
  • Preliminary Bridge Plans
  • Roadway Construction Plans
  • Surveys
  • Environmental Permit Modification
  • Signal Design
  • Signing & Pavement Marking Plans
  • Maintenance of Traffic Plans
  • Erosion Control Plans
  • Bridge Construction Plans

Location Map