Browse All Projects
|
Viewing Projects 61 - 80 of 106
|
-
Piedmont & Northern Railroad Reactivation
Location: Gaston & Mecklenburg Counties, NC
Florence & Hutcheson (F&H) completed planning and environmental studies for reactivating the Piedmont and Northern (P&N) Railroad in Gaston County and Cedar Yard in Uptown Charlotte,
-
US 378 Bridge Over Great Pee Dee River Foundation Testing
Location: Florence & Marion Counties, SC
The 4032-foot long bridge carrying US-378 over the Great Pee Dee River in Marion and Florence Counties was in serious disrepair and in need of replacement. The bridge was ranked #9 on the South
-
Virginia Dare Memorial Bridge
Location: Manteo, NC
Florence & Hutcheson had the opportunity to team as a subconsultant with Wilbur Smith Associates on the design of the US 64/264 Manteo Bypass. The 7.8 mile, 4-lane bypass includes a 5.2 mile
-
Benton Bypass
Location: Benton, KY
This project is a 5.5 mile section of US 641, the Benton Bypass, in Marshall County, KY. The project is a four-lane divided limited access facility on new location including a trumpet
-
I-264 Watterson Expressway Interchange
Location: Jefferson County, KY
The project is located on the Watterson Expressway (I-264) in Jefferson County, KY. The project included the reconstruction of 1.8 miles of the Watterson Expressway from a four-lane facility to
-
I-85 Bridge Replacement Over Broad River
Location: Cherokee County, SC
The bridge replacement project is along I-85 and S-668 frontage road in Cherokee County, South Carolina. The Interstate and frontage road bridges over Cherokee Creek were structurally deficient
-
Smithland Hydroelectric Design-Build
Location: Smithland, KY
Work has begun on construction of the cofferdam and excavation for the new Smithland Hydroelectric Power Generating Station owned by American Municipal Power of Columbus, OH. Florence &
-
Draffenville Wastewater Treatment Plant
Location: Marshall County, KY
The wastewater plant serving Marshall County Sanitation District No. 2 was undersized and suffered from reliability problems.
Florence & Hutcheson was selected to assist the District
-
Reidland Water Interconnection Improvements
Location: Paducah, KY
This project involved extending three miles of 18” HDPE water transmission lines from the existing Paducah distribution system across Clarks River to a new 2 Million
-
Red Duck Creek Interceptor Rehabilitation
Location: Mayfield, KY
This project addressed known capacity issues along Mayfield Electric & Water Systems’ 21-inch and 15-inch sanitary interceptor sewers along Red Duck Creek through downtown Mayfield. Due to
-
US 60 Water and Sewer Utility Relocation
Location: Henderson, KY
This project involved the relocation of approximately 6,000 l.f. of 10”- 24” DIP water line, 4,000 l.f. of 8” – 12” gravity sewer, and 3 submersible sanitary sewer pump
-
Kuttawa Wastewater Expansion, Phases I & II
Location: Kuttawa, KY
Florence & Hutcheson was selected to complete planning, design, and construction services for this major wastewater system expansion project in Kuttawa, Kentucky.
The project
-
Lone Oak Area Waterline Replacement, Phases I & II
Location: Paducah, KY
The Lone Oak region of Paducah Water’s system has experienced numerous main breaks due primarily to system age. The combined Phase I and II projects involved replacement of existing 4-inch and
-
Reidland Pressure Zone Leak Detection Study
Location: Paducah, KY
F&H assisted Paducah Water in identifying an estimated 1 million gallon per day water loss within the Reidland system. We evaluated the Reidland distribution system using the InfoWater
-
SSES - Manhole Mapping & Rehabilitation
Location: Benton, KY
Phase I manhole mapping and rehabilitation efforts were the first steps identified for the City to gain better control of their collection system flows and to start the compliance initiatives
-
Reidland Emergency Interconnect and Booster Pump Station
Location: Paducah, KY
Paducah Water contracted with Florence & Hutcheson to 1) identify system improvements needed to interconnect the Paducah’s Southside Pressure Zone to the Reidland Pressure Zone, and 2)
-
Kuttawa Wastewater Treatment Plant-350,000 GPD
Location: Kuttawa, KY
The City of Kuttawa constructed a new 350,000 GPD wastewater treatment plant to replace the city’s aging 150,000 GPD plant. A three stage poly
-
US 45 Over The Illinois Central Railroad
Location: Mayfield-Grave County, KY
This project involved the Reconstruction of a 2.1 mile section of US 45 in Mayfield, Kentucky crossing the Illinois Central Railroad. The P&L crossing is a 90’ single span structure. The
-
NC Railroad Crossings in China Grove
Location: Rowan County, NC
In 2008, Florence & Hutcheson (F&H) began planning and environmental studies for closing two railroad crossings in China Groveat Ethel Lane and Juke Box Road and to provide access for
-
Union Pacific Railroad Overpass
Location: Bossier Parish, LA
The project consisted of an overpass bridge for the proposed realignment of Louisiana Route 3 over the Union Pacific railroad north of Benton, LA in Bossier Parish. Florence & Hutcheson
|
Viewing Projects 61 - 80 of 106
|